-- card: 118556 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 64774 -- name: Entering Costs 2 -- part 1 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=11 top=57 right=72 bottom=233 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 2 (button) -- low flags: 00 -- high flags: A003 -- rect: left=31 top=106 right=126 bottom=217 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Resource Table ----- HyperTalk script ----- on mouseUp go card id 17283 end mouseUp -- part 3 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part contents for background part 31 ----- text ----- Setting Up a Project -- part contents for background part 32 ----- text ----- Entering Costs & Income -- part contents for card part 1 ----- text ----- To enter resource costs: -- part contents for background part 6 ----- text ----- Choose Resource Table from the Chart menu. Select the cost field for the resource whose cost you want to enter. Type the unit cost. -- part contents for background part 7 ----- text ----- Click the Accrual Method to indicate whether the accrual method is Multiple or Single. Clicking the field toggles between the two methods. Single accrual assigns the resource cost to only one task at a time. Multiple accrual assigns the full cost to every task using the resource. Close the Resource Table. -- part contents for background part 27 ----- text ----- 1. 2. 3. -- part contents for background part 28 ----- text ----- 4. 5. -- part contents for card part 3 ----- text ----- 2 of 2